I remember installing my first ARC net Cable job or converting An IBM coax system over to 4 pr. in 500,000 ft new plant, and how about installing thinnet coax before those. I also remember sweating over the bids and holding my breath untill all the green lights came on. Franks right about phone guys and IT type cable,hub,switch and router work.