Numerous factors can attribute to large service loops being associated with crosstalk and RF interference (primarily the environment in which the loops are located, quantity and distance between any turns, physical location/direction that they are facing, UTP considerations, etc.)

5Yrs, I've only had to utilize service loops on one occasion: Several CSUs were removed from a rack, and we relocated the patch panels that were originally located above the CSUs so that their front port DS1 wiring would better align with patch panels in adjacent racks. Without the excess cable to work with, any other alternative would have included pulling and terminating new 100 pair cables.

Atcom VoIP Phones
VoIP Demo

Best VoIP Phones Canada


Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.

#442384 11/06/07 02:42 PM
Joined: Feb 2006
Posts: 409
Member
Offline
Member
Joined: Feb 2006
Posts: 409
As stated earlier in this thread, service loops don't need to be coils. What we have started to do on the equipment room side is route the cable in a manner so that it has about 5-6' of "slack". We route it past were it needs to go then come back. kind of creating an "S" curve. This creates enough slack so that the rack can be moved if need be.

We were subcontracted to do a job in which we had to remove 6 open racks housing data equipment and replace with locking cabinets. It would have been impossible if there had not been existing services loops.


WWW.EmeryCommunications.com
Authorized SMB Avaya Business Partner
#442385 11/06/07 03:03 PM
Joined: Dec 2004
Posts: 4,096
Member
*
Offline
Member
*
Joined: Dec 2004
Posts: 4,096
WOW three years and still a valid topic. :rofl:

I like 3 feet at the station end and 6 at the rack. The reasons? well first the only reason for slack at the station end would be retermination because of a failure. If relocation is needed then I would rather run new. As for the rack end the length is determined by the ability to move a rack in a given MDF or IDF. Most "rack rooms" dont allow for too much movement. So big room plenty of slack small room little slack. You get the point.

**Just my two bits**

#442386 11/07/07 08:24 AM
Joined: Sep 2006
Posts: 530
Member
Offline
Member
Joined: Sep 2006
Posts: 530
I always like to leave service loops for the obvious reasons stated in the above posts.


Samsung Dealer
www.firstcoastbiz.com
#442387 11/07/07 11:53 AM
Joined: Dec 2005
Posts: 7,056
RIP Moderator-Mitel, Panasonic
*****
Offline
RIP Moderator-Mitel, Panasonic
*****
Joined: Dec 2005
Posts: 7,056
Wish Silversam and other 'Bell-trained' guys would chime in here. Until I went to work for my present employer, 'service loops' were considered sloppy work. There is always a couple of feet of 'slack' for reterminations. If you need any more, you really need to repull the run! Move a rack, BS! "Poor planning on your part, does NOT constitute an emergency on my part". Hard to get along with, maybe. But prior planning results in fewer problems! smile John C. (Not Garand)


When I was young, I was Liberal. As I aged and wised up, I became Conservative. Now that I'm old, I have settled on Curmudgeon.
#442388 11/07/07 12:11 PM
Joined: May 2002
Posts: 17,722
Likes: 18
Member
****
Offline
Member
****
Joined: May 2002
Posts: 17,722
Likes: 18
Bell trained guy here, we never left service loops, just a foot or so slack incase of jack re-terminations. Never had to move the blocks. I do now leave slack at the station end for one reason only, sheet rockers. Terminal end if it's a suspended ceiling or somewhere I can conceal it yes. For patch panels, yes.


Retired phone dude
#442389 11/07/07 12:37 PM
Joined: Dec 2002
Posts: 9,424
Likes: 1
Member
*****
Offline
Member
*****
Joined: Dec 2002
Posts: 9,424
Likes: 1
I learned the drywall guy part the hard way. On the job I did this summer, one of my cables got cut and I had less than a foot to work with coming out of the box. I was able to make it all work smile
I did leave at least 10 feet of slack at the patch panel end, because the customer had custom cabinets made to go around the wall mounted panel (long story).


Jeff Moss

Moss Communications
Computer Repair-Networking-Cabling
MBSWWYPBX, JGAE
#442390 11/07/07 04:13 PM
Joined: May 2007
Posts: 5,058
Likes: 5
Moderator-1A2, Cabling
*****
Offline
Moderator-1A2, Cabling
*****
Joined: May 2007
Posts: 5,058
Likes: 5
I'm not a "Bell Trained Guy", though I worked with quite a few and had a number of years with GTE (We NEVER considered ourselves Bell! Heaven forbid. ANYTHING, but. We, were better then Bell [or at least, so we thought]).

In any event, we never left service loops.

A foot or two of slack in the ceiling for repair of a connector/amphenol, etc. Otherwise, No.

In a switchroom, (CO or PBX) if you left a 6-10 foot loop on every cable you would never have room for anything and the sheer mass of cables would keep you from getting to the slack. (Switchrooms [at least in my day] had a LOT of cable.

I would have to agree with John C. - If I have to move a rack, I'll recable it. Why would I have to move it, anyway? How often does something like that (whatever that is) come up?

When I wired computer rooms, the CGs always wanted 30' of slack under each cabinet in the raised floor)"in case they wanted to move anything themselves". Every 5 years or so, they paid us to strip out the computer rooms completely because there was so much cable under the floor the tiles wouldn't sit flush. We always made a fortune on them.

I never remember them moving anything themselves. Ever. When the rare occasion came and they called us to move something, if it reached, we would stretch it out, but usually we stripped it all out and rewired it.

Sorry for being so contrary, but that's how I feel. Finger loops on x-connects and on cable, a drip loop at the station end and s little less then that at the cabinet/rack.


Sam


"Where are we going and why are we in this hand basket?"
#442391 11/07/07 06:33 PM
Joined: Jul 2006
Posts: 2,719
Likes: 11
Admin
***
Offline
Admin
***
Joined: Jul 2006
Posts: 2,719
Likes: 11
I also trained in a NOTC/GTE central office. We had enough cable issuses to worry about than service loops. You mined as much cable as you could and sewed in the new runs on top of the old, never leaving "service loops." If a bay needed to be relocated, you ran new cable to it.

Cross-cuts were different, beccaue you needed some slack to do transfer and regrouping and to pull a jumper to ID it.

The last two retail jobs I did had the "service loops". I had to laugh. The longest run engineered for 294' ended up at 309'. It just barely passed the scanner test.

Carl

#442392 11/07/07 07:06 PM
Joined: Jun 2005
Posts: 68
Member
Offline
Member
Joined: Jun 2005
Posts: 68
I only ever left some slack on the jack side if something needed to be reterminated. On the patch panel side? Never, too many cables and once it's installed if it has to move it will typically be more than a 1.5' slack loop would allow.


-Robert F
Page 2 of 7 1 2 3 4 5 6 7

Moderated by  Silversam 

Link Copied to Clipboard
Forum Statistics
Forums84
Topics94,306
Posts638,894
Members49,771
Most Online5,661
May 23rd, 2018
Popular Topics(Views)
212,907 Shoretel
190,067 CTX100 install
188,227 1a2 system
Newest Members
Mansour, Dave Simmons, Soulece, Robbks, A2A Networks
49,770 Registered Users
Top Posters(30 Days)
Toner 17
teleco 6
dexman 6
jsaad 5
dans 5
Who's Online Now
1 members (Professor Shadow), 49 guests, and 26 robots.
Key: Admin, Global Mod, Mod
Contact Us | Sponsored by Atcom: One of the best VoIP Phone Canada Suppliers for your business telephone system!| Terms of Service

Sundance Communications is not affiliated with any of the above manufacturers. Sundance Phone System Forums - VOIP & Cloud Phone Help
©Copyright Sundance Communications 1998-2024
Powered by UBB.threads™ PHP Forum Software 7.7.5